In 2011 we installed thousands of meters of pipe, in Southern Ontario, Toronto GTA and York Region; with pipe ranging in size from 1’’ to 24’’ diameter. Our service benefits hydro, Bell, fiber optics and gas. Click to view our new Video.
Some of our projects:
Project: Southeast Collector Trunk Sewer, York Region – 2011 – 2012
- 100mm, 150mm, 300mm HDPE and Lockable PVC
- Total footage: 1460m x 100mm, 6154m x 150mm, 570m x 300mm drilled lines for raw water supply for tunnel. Very challenging ground conditions through cobbles and boulders
Project: Thackary Landfill site, City of Toronto, Gravity Feed Sewer – 2011
- 400mm HDPE
- Total Footage: 107m at 0.8% grade drilling through garbage dump to existing sewer for waste water.
Project: Finch Ave watermain replacement, Toronto
- 300mm PVC
- Total footage: 605m of 300mm PVC in very congested area of Toronto, including a shot across the national fiber lines, a busy bus terminal (TTC), and then down the side of Finch Ave all at once.
Project: Highway 404 Extension, Keswick, Enbridge Gas – July 2011
- 200mm (8”) steel pipe, 4” steel pipe
- Total footage: 900m Epoxy coated steel main completed in one shot. Two additional shots of 500m each of 4” steel pipe
Project: King High Drive, City of Vaughan, watermain replacement – 2011
- 150mm + 300mm Lockable PVC
- Total Footage: 320m of 300mm and 1240m of 150mm
Project: Highway 404 + Sheppard Ave, Toronto, Ontario, Fiber Optic Installation
- 4” Poly
- Total footage: 125m time sensitive project across 14 lanes of highway. Completed in 8 hours
Project: Rosebank Pumping Station, Region of Durham – 2010
- 300mm (inside) 14” dips
- Total footage: 170m through a very environmentally sensitive area (Petticoat Creek Conservation Area), TRCA Lands, within 100m of Lake Ontario. Elevation changes of 60 degrees, and no disturbance to surrounding areas
Project: West Duffins Creek, Region of Durham – 2009
- 150mm, 200mm, 300mm HDPE
- Challenging creek crossing through TRCA lands, as well as in shale. Three lines installed 1m apart for future sub division sanitary sewer.
Project: Queen Mary Drive, Halton Region
- 300mm Fusible PVC
- Total footage: 320m drill shot in limestone shale and in a residential area.
Project: Queens Plate, City of Toronto – Gravity Feed Sewer
- 250mm Lockable PVC
- Total footage: 80m shot across Hwy #27 in a highly congested area adjacent to a large shopping mall and amusement park
Project: Fishleigh Ave forcemain replacement, City of Toronto
- 300mm HDPE
- Total footage: 650m Drilling along the bluffs’ edge in Toronto
Project: Rough River, Bell Telecom
- 8 x 4” + 4 x 1.5” Poly
- Total footage: 250m crossing in Toronto Conservation Authority land. The Rough River is a spawning river for Rainbow Trout, making the project high risk. The shot involved a large elevation change and challenging ground conditions.
Project: Yonge Street Watermain Replacement, City of Toronto – June 2009
- 12” (300mm) Lockable PVC
- Project was in a very congested area of Yonge Street, requiring the use of a small drill to install 300mm pipe. There were many existing utilities in the way, plus traffic and pedestrians.
Project: City of London – Transmission Line
- 450mm Fusible PVC
- Total footage: 1295m done in 10 shots, including a 450m bore across the Oxbow Creek, an environmentally sensitive area
Project: City of Toronto, Imperial Oil/Esso – Gravity Feed Sewer April 2008
- 200mm (8”) Lockable PVC
- Total: 115m at grade of 0.5%
Project: Highway 407 & Derry Road – Fiber-Optic Installation June 2008
- 4” HDPE
- Total: 140m Time sensitive shot, completed in solid shale in 12 hours
Project: Township of Tay – Transmission Line August 2007
- 300mm (12”) HDPE
- Total: 820m including a 440m bore through environmental sensitive marsh